Skip to content

Budapest, XIII. kerület

Air conditioning installation

Completed: August 2026
  • Klíma

About this project

During the work, we professionally installed 2 Fujitsu side-wall split air conditioners. The implementation included the installation of the indoor and outdoor units, the design of the cooling circuit pipes and electrical connections, as well as the vacuuming and commissioning of the system. The equipment was installed in accordance with the site conditions, aesthetically and according to the manufacturer's specifications.

Click an image to view full size

New install

Looking for something similar?

Request a free on-site assessment — we reply within 24 hours and prepare a detailed quote.

projects.viewAll